DSS-1000
Structural
1. New construction (build-to-suit) minimum inside wall dimensions: 9′ x 12′ x 70′.
2. Screen will be mounted out from the back wall on a Unistrut frame:
p System includes all necessary materials for the target face.
3. Doors, if desired, can be located on either or both sides of the tunnel:
p The shooting line and viewing area do not need to be enclosed.
Electrical
1. One standard 120v electrical outlet for the projector should be located 23′ plus or minus 6″ from the closed end of
the tunnel. This outlet should be positioned on the side wall (see drawing on the other side). A second standard 120v
electrical outlet should be located in the proximity of the computer console.
2. Each outlet for the computer console and the projector must be on an unloaded circuit or an isolated ground circuit.
System includes all surge protectors.
3. Lighting:
p A light for arrow retrieval can be located behind and above the projector, and should be turned off while
shooting. This light should be on a separate on/off switch.
p Light for the shooters at the shooting line should be recessed track lighting with a rheostat/dimmer switch. We
recommend using black lights at the shooting line which helps to illuminate fiber optic sights. This allows
shooters to adjust the shooting light.
Finish
1. Inside walls, ceiling, etc. should be painted flat black; nothing should reflect light onto the screen.
2. Industrial grade, low pile, dark color carpet should cover the entire floor area inside the tunnel
(12′ x 62′ minimum).
Note: To carpet the viewing area, extend the carpet to the back wall. Please check with your local Fire Department
for fire code regulations.